You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Introduction

  • The Retry Instruction adds error handling to a number of job nodes in a workflow.
  • If one of the jobs in the Retry block fails, then the order is moved to the begin of the Retry block to repeat execution.
  • The number of retries and the respective delays are configured with the Retry Instruction.
  • If the maximum number of retries is reached and a job in the Retry block fails then the order is considered being failed.

Workflow Instruction: Retry



Explanation:

  • If any of the three jobs within the Retry block fails then the order will wait for the specified delay and will repeat the Retry block from the first job node.
  • This example makes use of a maximum of 10 retries and an individual delay per retry each being added one more second.
  • If the number of delays specified is lower than the number of retries then the last delay specified will be used for subsequent retries.


  • No labels