...
- JobScheduler Monitoring Errors: Job Chains that end with an error are sent to this service. The last error notification is shown in the column "STATUS INFORMATION".
- JobScheduler Monitoring Success: Job Chains that end with success, that is with a positive notification, are sent to the monitoring system. To be exact, the history of a specific Job Chain is monitored to see whether a specific work-flow has been executed or not. The last success notification is shown in the column "STATUS INFORMATION".
- JobScheduler Monitoring Performance: Here timers are used to measure the performance of a Job Chain. If a Job Chain takes too long to end, a warning alert will be sent to the System Monitor. The information about the expired timer is shown in the column "STATUS INFORMATION".
Change Management References
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
See also
- JobScheduler Monitoring Interface - Prerequisites and Installation
- JobScheduler Monitoring Interface - Configuration & and Use Cases
- JobScheduler Monitoring Interface - XML Configuration
...